Similar to ASARCO Tacoma WA
Quote:
Originally Posted by
FUJIMO
...the 65 acre site scope of work consisted of asbestos abatement, lead abatement, PCB removal, TSCA waste removal, UST removal, soil remediation, and site preparation, among many other things. 700,000 square foot main building demolition as well as other smaller buildings...
https://th.bing.com/th/id/R.d763c969...pid=ImgRaw&r=0
Very similar to ASARCO smelter clean up except ASARCO had a huge stack that dispersed all kinds of toxic dust for 10 miles in any direction. Federal funding paid for six vertical feet of topsoil to be removed and replaced for any home owner within that 10 mile radius. The smelter is now a site for condos, theaters and open air markets.